This project started in January 2012 and consisted of:
• Spiral Casings
• Draught Tubes
• Draught Tube Second Part [Hoppers]
• Trash Racks
• Intake Gates
• Dewatering Gates
The weight of the complete order was 170 tons and was completed over a period of 12 months. Belvon has done the pressure testing of the spiral casings to a pressure of 10bar for a period of 2 hours, to check for any leaks on this critical component.
These components are to be installed at Kibali Gold mine in the DRC mid 2013.
|
This project was completed in 2011 and consisted of:
• Trifurcation [9000 dia]
• Square to Rounds
• Straight Drifts
• Self-Closing Doors
• Inlet Bellmouth
• Impeller Track Casing
• Fan Casing
• Lobster Bends
• Discharge Evase
The total weight of this project estimated at 180 tons of fabricated components and was installed and commissioned by Actom Mechanical Equipment for Sasol Tubelisha.
|
A complete BH20 Battery Hauler built for Joy Global consisting of:
• Battery Tray
• Tractor and Canopy Frame
• Mid- and Moving Sections
• Trailer and Side boards
• Transfer Body
• Ejector
• Tailgate.
We continuously build new haulers as well as refurbish haulers that have been in operation from various mines
We also supply Joy with small bolt on components and parts as to their needs.
|
We recently manufactured a S360 scoop as well as a S280 scoop consisting of:
• Front Frame and Covers
• Rear Frame and Covers
• Fenders and Canopy
• Bucket and Blade
• Battery-Holder, -Changer and Tray
We continuously build new haulers as well as refurbish haulers currently in operation from various mines
We also supply Joy with small bolt on components and parts as to their needs.
|